Underground explosion on North Road caused by “heavy rainfall”
By Eleanor Tait
Following an underground explosion near Framwellgate Bridge in Durham City on Friday 24th May, a spokesperson for Northern Powergrid has revealed that the incident was the result of “recent heavy rainfall”.
After flames were witnessed bursting from the pavement on North Road opposite the Fighting Cocks pub just after 12:30 BST last Friday, the County Durham and Darlington Fire and Rescue Service was quickly alerted by a call at 12:34 BST reporting the occurrence of a “small explosion.”
A cordon was subsequently placed between Framwellgate Bridge and North Road by the fire services, with Durham Police also responding to the incident, ensuring public safety by advising shoppers to avoid the area.
Damage to paving stones and nearby brickwork was sustained, and a rapid response paramedic and duty manager were dispatched by the North East Ambulance Service before it was confirmed that no one was injured.
“We can confirm that [the explosion] was due to an underground cable fault, as a result of the recent heavy rainfall”
NORTHERN POWERGRID
It has also been reported that an electrical power-cut coincided with the incident causing disruption at Dunelm House on New Elvet (Durham Students’ Union), where the automatic entrance doors were closed shut for a period of time. Shops and restaurants in the city centre also closed or went cash only.
Suspecting the explosion to have been caused by a gas or electrical issue, emergency services awaited the arrival of support from local gas and electric boards. They attended the scene until the arrival of the Northern Powergrid at 14:15 BST, when they were stood down.
Northern Powergrid have since confirmed that the explosion was caused by an electrical cable fault which they attributed to the “recent heavy rainfall” in Durham.
The cordon has now been removed, with a spokesperson for Northern Powergrid saying that “no customers are currently without power”, adding that “We’d like to thank our customers for making us aware, and for their patience whilst we work in the area to safely repair the fault.”
The damaged footpath has now been surrounded with a barrier and closed off to pedestrians until repairs are completed.
Image: Eleanor Tait

